How to read a telehandler load chart
The number in the machine name is the best case. The chart is the rule, and it is the one the machine obeys.
Every telehandler carries a load chart in the cab. It is not paperwork. It is the only statement of what the machine will actually lift, and it changes with every foot the boom goes out or down.
A machine called a ten thousand pound telehandler is rated for that with the carriage tucked in and low. Push the boom out to full reach and the same machine may be rated a fraction of it. Nothing is wrong with the machine; that is physics, and the chart is where the manufacturer wrote it down.
Reading it
- Find your reach first
- Then your height
- Read the zone, not the edge
- Check what the forks are carrying
- Level, and on its tyres or its outriggers
The mistake that puts machines over
Planning the lift from the machine name. Somebody books a ten thousand pound telehandler for an eight thousand pound load, gets to site, and finds the load has to go twenty five feet out to clear a foundation, where that machine is rated nothing like eight thousand pounds.
The second mistake is the jib. A truss boom raises hook height above the fork height, which is exactly why people fit one, and it drops capacity to a few hundred pounds. It is rated for straight ahead lifts only.
Tell us the weight, the height and the reach before you book and we will read it off the actual chart for the actual machine.
The two telehandlers we rent
- 10,000 lb Telehandler — 44 ft Lift Height
$299.00 CAD per day, $949.00 CAD per week, $2,049.00 CAD per four weeks
- 8,000 lb Telehandler — 55 ft Lift Height
$550.00 CAD per day, $1,850.00 CAD per week, $4,500.00 CAD per four weeks
Both carry their load chart in the cab. The specifications on each machine page state the figures the chart governs.
Questions we get asked
- Where is the load chart?
- Does the load chart change with a different attachment?
- Can you tell me whether my lift is within the chart?
